      Proposta de utilização do sistema Period Batch Control para redução de lead time em uma empresa de bens de capital Translated title: Lead time reduction in a capital goods company by means of the implementation of Period Batch Control system

      research-article

      Read this article at

      Bookmark
          There is no author summary for this article yet. Authors can add summaries to their articles on ScienceOpen to make them more accessible to a non-specialist audience.

          Abstract

          O objetivo do presente trabalho é apresentar uma proposta para a utilização do sistema PBC (Period Batch Control), assim como de dois pré-requisitos, a saber: mudança na política de controle da qualidade e criação de uma célula virtual, para reduzir o lead time em uma empresa de bens de capital. O método de pesquisa utilizado é o estudo de caso. Resultados previstos de tal implantação indicam que a empresa estudada poderá obter vantagens significativas com a adoção do PBC como, por exemplo, redução de 46,42% no lead time do produto estudado, diminuição de custos de WIP (Work In Process) em aproximadamente 50% e redução de 31% no tempo improdutivo. Esses resultados promissores podem ser alcançados também por empresas com características semelhantes que sigam a proposta apresentada neste artigo. Academicamente, o presente trabalho contribui para aumentar a divulgação do sistema PBC, assunto carente de pesquisas no Brasil.

          Translated abstract

          The goal of this work is to present a proposal for the use of the PBC (Period Batch Control), as well as two prerequisites, namely, to change the policy of quality control and creation of a virtual cell, to reduce the lead time in a company which produces capital goods. Case study research is the methodology used in this paper. Expected results of this implementation indicate that the company can obtain significant benefits by the adoption of PBC, such as 46.42% lead time reduction, reduction on WIP (Work In Process) costs in approximately 51.56% and unproductive time in 31%. These promising results can be achieved by companies with similar characteristics. Academically, this work contribute to increase the dissemination of the PBC, a subject in need of research in Brazil.

          Related collections

          Most cited references37

          • Record: found
          • Abstract: not found
          • Article: not found

          Iterative triangulation: a theory development process using existing case studies

          M. Lewis (1998)
            Bookmark
            • Record: found
            • Abstract: not found
            • Article: not found

            Production flow analysis

              Bookmark
              • Record: found
              • Abstract: not found
              • Book: not found

              Future perfect

                Bookmark

                Author and article information

                Contributors
                Role: ND
                Role: ND
                Role: ND
                Role: ND
                Role: ND
                Role: ND
                Journal
                prod
                Production
                Prod.
                Associação Brasileira de Engenharia de Produção (São Paulo )
                1980-5411
                December 2010
                : 20
                : 4
                : 0
                Affiliations
                [1 ] Universidade Federal de Goiás Brazil
                [2 ] Universidade Federal de Goiás Brazil
                [3 ] Universidade Federal de São Carlos Brazil
                [4 ] Universidade Federal de São Carlos Brazil
                [5 ] Universidade Federal de São Carlos Brazil
                [6 ] Universidade Federal de São Carlos Brazil
                Article
                S0103-65132010000400010
                9e7ce3cd-9cbc-4af7-b557-90504729d762

                http://creativecommons.org/licenses/by/4.0/

                History
                Product

                SciELO Brazil

                Self URI (journal page): http://www.scielo.br/scielo.php?script=sci_serial&pid=0103-6513&lng=en
                Categories
                ENGINEERING, MANUFACTURING

                General engineering
                Production planning and control,Period batch control,lead time reduction,Planejamento e controle da produção,Period Batch Control,Redução de lead time

                Comments

                Comment on this article